How Long Should an Expert Work Visa Take? The GCRT’s 60-Day Benchmark, Then and Now
For a company planning a project abroad, the length of the visa process is often more important than the visa itself. A tender, a product launch or a plant opening cannot wait for an open-ended procedure. In 2011 the draft Global Corporate Relocation Treaty put a number on what “reasonable” should mean: 60 days.
What the GCRT proposed
Section 9 of the draft treaty required contracting states to set guidelines that guarantee “the transparency and fairness of the process” and its completion within a reasonable time. States would “seek to have the process of issuing the visa extend not longer than 60 days, from the date of the submission of the application for the visa until its issuance.”
The authors described 60 days as “a reasonable and attainable target, taking into consideration the various countries’ accumulated experience”. They tied it to transparency: Section 12 required every state to publish its rules and every change to them, in English, through the treaty depositary.
The later IBA protocols went further for trusted employers. The Intra-Company Transfers protocol (2014) proposed that a pre-approved company receive a decision on its status within 30 days, and that each transferee’s permit be handled through premium processing because the sponsor had already been vetted.
Where things stand today
The trusted-sponsor idea has become the main way countries speed up expert visas. Typical published timeframes now include:
- Netherlands. For a highly skilled migrant, the legal decision period is 90 days. If a recognised sponsor files a complete application, the target is 2 weeks (IND, decision periods; IND, recognised sponsor).
- United Kingdom. The standard processing time for a Skilled Worker visa applied for outside the UK is 3 weeks, after the employer, a licensed sponsor, has issued a certificate of sponsorship (GOV.UK).
- Germany. Under the fast-track procedure for skilled workers, the employer starts the process in Germany for a fee of €411. The visa appointment is booked within three weeks, and the mission usually decides within three further weeks. Recognition of qualifications can take up to two months, so the whole process “may take about four months in total” (Make it in Germany, 2022).
- Israel. Short-term expert (SEA) B-1 work visas of up to 90 days a year are processed within 10 business days (Fragomen, 2021).
Then and now at a glance
| Country or proposal | Published timeframe | Condition |
|---|---|---|
| GCRT draft treaty (2011) | Up to 60 days | Any expert with a local sponsor |
| Netherlands | 2 weeks target (90 days legal) | Recognised sponsor, complete file |
| United Kingdom | 3 weeks | Licensed sponsor, standard service |
| Germany | About 6 weeks after pre-approval; about 4 months overall | Fast-track procedure, fee €411 |
| Israel (short-term) | Up to 10 business days | SEA B-1, up to 90 days a year |
What has and has not changed
For employers that are already trusted sponsors in leading destinations, decisions now often arrive well inside the GCRT’s 60-day target. Two parts of the 2011 vision are still missing. First, the fast lane usually depends on the employer’s status, so smaller companies and first-time sponsors may still wait much longer. Second, there is no single place where every country’s rules and timeframes are published in one language, as the treaty’s depositary was meant to provide. Comparing processing times still means reading dozens of national websites.
Processing times are the published targets or standards of each authority at the time of review and are not guaranteed. This article is general information, not legal advice. Confirm current timeframes with the relevant authority or a qualified adviser. Last reviewed: November 2026.